What usually turns out to be unpermitted
The list barely changes from house to house. Finished basements, rear decks, dormers, a garage turned into a bedroom, a sunroom off the kitchen, a second kitchen put in for a relative who moved in years ago.
Most of it was built competently by people who knew what they were doing. It simply never went through the building department, and the work stays unpermitted no matter how well it was built or how long ago it happened.

What we bring to unpermitted work, beyond the money
Most owners get here after one call to the building department that raised more questions than it answered. What we can offer first is somebody who has been through this repeatedly telling you plainly what your options are.
If selling suits you, we buy with the unpermitted work in place. If the addition could be legalized without much trouble and the house would net more legalized and listed, we will say so and give you the name of an expeditor. Neither conversation costs you anything.
What this looks like in Valley Stream specifically
Valley Stream is roughly 40,634 people in Nassau County, ZIP 11580, and the housing stock is mostly cape cod, colonial, tudor. Around Green Acres Mall and Sunrise Highway, most of it is old enough that the mechanicals are on their second or third life. The Valley Stream stop pulls buyers who commute, which supports the good houses and does very little for the ones that need a roof. We have been buying across Nassau County for 15+ years. We know what the Valley Stream Central High School District does to a resale price, which blocks still have oil tanks in the ground, and what a house like yours is actually worth here.
The median is up 8.47% year over year as of 2026-05. A firming market gives you a little room for error on price, which is worth more than it sounds when the house is not in showable condition. A $775,000 median puts Valley Stream in the band where buyers are stretching to afford the house and have nothing left for the roof. That is precisely the buyer who walks away from a property needing work, and it is why condition matters more here than the price alone suggests. The median house here goes under contract in about 33 days, which is quick for Long Island. It is also a figure that only applies to property in showable condition.
Appraisals, unpermitted square footage and the certificate of occupancy
Two separate parties care, which is what makes this harder than people expect. The lender wants the value it is lending against to be real and legal. The title company wants the buyer to take the property without open items attached to it.
An open permit or a missing sign-off can show up as an exception on a title report, and work done off the books has a way of producing both at once. Satisfying one of them is manageable. Satisfying both on a contract timeline is where sellers come unstuck.
Why legalizing unpermitted work takes longer than anyone expects
Ask an attorney or an expeditor before you assume anything, in either direction. We have seen owners spend months chasing approvals they were never going to get, and we have seen others avoid selling for years over something that would have been permitted in a season.
The only way to know which one you have is to put the file in front of somebody who works with that department regularly. We are glad to tell you who we would call in Valley Stream, and there is nothing owed to us for it.
What the two paths cost in Valley Stream
These are the two routes open to you with a house with unpermitted work, priced against what Valley Stream houses actually sell for.
Work it against Valley Stream's own numbers. The median sale here is $775,000. A 5% commission on that is $38,750, and seller closing costs of about 2% add roughly $15,500. Those are costs we can cover on our side. That is $54,250 gone before anyone counts the repairs it took to get the house listable.
There are two waits in a listed sale and people usually only count the first. In Valley Stream the median house takes about 33 days to go from listed to a signed contract. Then it waits again, typically 45 to 60 days, while the buyer's lender orders an appraisal and underwrites the loan. Call it 78 to 93 days from sign to keys, assuming nothing goes wrong.
The part worth understanding is what a signed contract actually guarantees, which is less than most sellers assume. A retail buyer with a mortgage contingency can walk away right up to the end. If they do not qualify, if the appraisal comes in under the price, if they change their mind and let the financing lapse. A share of deals die exactly there, after months of waiting, and the house goes back on the market with time on it. We are not borrowing anything, so there is no lender to satisfy, no appraisal to come in low and no contingency to exercise.
| Listing with an agent | Selling to us | |
|---|---|---|
| Sale price | $775,000 (Valley Stream median) | Our written offer |
| Commission | −$38,750 | None |
| Seller closing costs | −$15,500 | We can cover them |
| Repairs before listing | Out of pocket | None |
| Cleanout | Yours | Ours |
| Showings | Until it sells | One visit |
| Listed to signed contract | 33 days (Valley Stream median, once listable) | 24 hours to a written offer |
| Contract to closing | 45 to 60 days (waiting on the buyer's lender) | A date you choose |
| Total wait | 78 to 93 days if nothing falls through | Yours to set |
| Can the buyer walk? | Yes (mortgage contingency runs to the end) | No financing to fall through |
| Before repairs and carrying | $720,750 | The number we put in writing |
The listing column assumes a 5% commission and seller closing costs of about 2%. Both vary. We have not subtracted repairs or the cost of carrying the house while it sits, because those depend on the property. A house in good condition listed with a good agent can absolutely beat a cash offer, and we will say so if that is your situation.
Which route nets more when the work was never permitted
Sometimes legalizing first is genuinely the better move, and we will tell you when we think so. A deck that needs a permit and an inspection is a different proposition than a garage conversion the zoning may never allow.
The calculation turns on what has to be spent before anything is recovered. Permit costs, drawings, the corrective work an inspector asks for, and the months the house carries while all of it happens. A cash sale frequently wins on the net rather than on the headline number.
How we arrive at a number on a house with unpermitted work
On a house with unpermitted work, the number comes from three things: what it will be worth when the work is finished, what the work will cost, and a cushion in case we are wrong on either. That is all there is to it. There is no formula we are keeping from you.
- What it is worth repaired. Not the Valley Stream median of $775,000 on its own, but what houses like yours on your street actually closed at recently.
- What the work costs. Roof, boiler, electric, the kitchen and bath. In Valley Stream the stock is largely cape cod and colonial, and on houses that age the mechanicals are usually the expensive part rather than the cosmetics.
- How long we will hold it. The median Valley Stream house goes under contract in about 33 days once it is showable, then waits 45 to 60 days more on the buyer's lender. Ours has to get to showable first, and we carry taxes and insurance across the whole of it.
- What we are wrong about. Some of what a house needs only shows once the work starts. We price that in, and it is a big part of the gap between a cash offer and a retail sale.
Why this works for us when it would not for you
This is the part cash buyers tend to gloss over. We run millions of dollars of construction a year. That buys materials at contractor pricing and keeps our own crews working through the year, so the same renovation costs us roughly half what it would cost you to hire it out.
That is the business in one line. It is also why renovating before a sale rarely pays: you would buy the same roof and boiler at retail and hope to get it back at resale, which usually does not happen. We do not make our money by paying you less. We make it by building for less.
If the number does not work for you, tell us so. We would rather have that conversation than pressure anyone. We will look at where you are and give you an honest read on your options, including ones that do not involve selling to us. Plenty of sellers are better off with an agent, and we will say so if you are one of them.
No permit has to be pulled before you sell
The next step is short. Tell us what was built and roughly when, send whatever the town has sent you, we come out once, and you get a written number within a day.
No permits, no drawings, no cleanout, and no sign on the lawn in Valley Stream. If what we see suggests the work could be legalized easily enough that you would net more that way, we will tell you so and give you the name of the expeditor we would use.
Common questions
Will unpermitted work stop a buyer getting a mortgage on a Valley Stream house?
Frequently, yes, and it is the reason unpermitted work matters far more at sale than it ever did while you lived there. The loan is secured against the house as the town's records describe it, and an unpermitted addition is not in those records. Some Valley Stream buyers get past it with a cooperative lender and a long timeline. Many do not. Selling for cash removes the question entirely.
Do I have to pull permits before selling my Valley Stream house?
Not to sell to us. We buy with the work unpermitted and take the file on afterward. Whether you need them for any other purpose is worth putting to an attorney.
The previous owner did the unpermitted work. Does that change anything?
Not for us, and not for the town either, because the file follows the property rather than the person who built the addition. It is one of the most common versions of this we see.
Will the town find the unpermitted work when I sell my Valley Stream house?
What the town knows and when is not something anyone should guess at. Your attorney can tell you what a sale in your situation actually triggers. From our side, nothing you disclose changes our offer.
There is already a violation for the unpermitted work. Can you still buy?
Yes, and it is a common starting point for these conversations. Tell us what the notice says and we will price it once rather than being vague now and revising on you later.
How much does unpermitted work take off the price of a Valley Stream house?
It depends what it would take to legalize it and what the risk is that the town says no. A finished basement is usually a smaller adjustment than an addition sitting in a setback. We would rather price it accurately once than revise later.